fbpx
0_000198

ENZO DEGLI ANGIUONI

Lecco

Project
Buildings
Interiors

Type
Production

Area
1 000 sqm

Client
Enzo degli Angiuoni

Program
Textile Factory with Workshop and Office Spaces

Year
2002

The core of the factory complex was built using mixed traditional technology, a concrete structure, brick curtain walls and trusses. The new warehouse, with its simple, classic pre-fabricated volume, reaches slightly above the old construction. The part of the façade which was originally in reinforced concrete panels has been painted in tar black, as have the existing transformer station and the meter housing near the entrance. Black has also been used for the external paving in slate gravel, so as to provide continuity along the surfaces and through the color palette of the interiors.

NEXT PROJECT

fiera_uf_01
Project Buildings
Type
Client Fondazione Fiera Milano
Year 2008